Hendry County, from the Caloosahatchee to Lake Okeechobee. Built to order by Weather King, delivered and leveled in your yard, rent-to-own with no credit check.
LaBelle is about 55 road miles from Port Charlotte. Delivery and setup are free for the first 50 miles and $5 a mile after that, so figure roughly $25 for delivery — text us the address and we'll give you the exact number before you order. Port LaBelle and the Montura and Pioneer Plantation acreage are in the same range. Clewiston is the far end of our territory at about 90 miles, which puts delivery around $200 — we'll quote it exactly, and on a bigger building it's still usually less than the drive to a lot in Fort Myers and back.
We're a family-run Weather King dealership (dealer #6851) with no display lot. You choose from the price sheet or design it in 3D, Weather King builds it in about 3–5 weeks, and the driver sets it on treated blocks and levels it. Hendry County is ranches, groves and half-acre-to-five-acre homesteads, so the orders run to lofted barns, garages and 14-ft-wide buildings.
Homestead lots and ranch acreage. Four buildings we deliver to Hendry County most:
| Size | Style | Base price |
|---|---|---|
| 10x16 | Lofted Barn | $5,375 |
| 12x20 | Lofted Barn Cabin | $9,105 |
| 12x24 | Portable Garage | $9,565 |
| 14x32 | 14 ft Utility | $12,765 |
Base building, delivered and set up free within 50 miles of Port Charlotte ($5 per mile past that). Prices are estimates, don't include sales tax or add-ons, and can change without notice. See every style and size →
Permits, setbacks and anchoring are the homeowner's responsibility, but you won't be doing it blind — call or text us and we'll walk you through what your office wants.
Where this comes from: Hendry County – Building & Licensing · Hendry County – permit application checklist (Shed – Prefab) · City of LaBelle – building forms and permit applications · City of LaBelle – building permit fees · City of Clewiston – permit FAQs · Florida HB 803 (2026). Rules and fees change — confirm with the office before you order.
LaBelle is about 55 road miles from Port Charlotte, so about $25. Port LaBelle and Montura are similar. Clewiston is about 90 miles, so around $200. Text us the address and we'll give you the exact number before you order.
Its "Shed – Prefab" application asks for a site plan with distances to every property line, the building's size, and the state product approval or engineered plans with tie-down specs. We send the engineer plans and the anchor plan with every building.
Port LaBelle is unincorporated Hendry County, so the county office at 640 S. Main Street handles it. Inside the LaBelle city limits it's the city's own building department at 80 Euclid Place, where a pre-engineered utility shed permit is $65.
Yes. The 14-ft-wide buildings (up to 14x40) travel with a pilot car, which adds a permit fee for the trip. Tell us about the road and the gate so the driver comes with the right rig.
Pick whatever’s easiest — we answer them all, usually the same day.